Ningbo Everest Enclosure Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. LIU EVEREST
  • Company Name : Ningbo Everest Enclosure Co., Ltd.
  • Tel : 86-574-13968271923
  • Fax : 86-574-23660328
  • Address : Zhejiang,Ningbo,1201 North Block, Central Building, Hushan St., Cixi
  • Country/Region : China
  • Zip : 315300

aluminum injection packer

aluminum injection packer
Product Detailed
Aluminum injection packer 1.Specifications:13mmdiameter*80mm /100mm /150mm 2.Package;500pcs a carton 3.MOQ:5 cartons

Aluminum injection packer

Specification   Length  

 Diameter

A-8             80mm  13mm
A-10  100mm   13mm
  A-15                  150mm  13mm
A-20 200mm   13mm

Product Introduction

Injection packers are filler necks used as connection pieces between the injection device and the building component e.g. when sealing building structures or repairing cracks in the framework of crack injections. Zerk or button head fittings located on the top of the injection packer form the connection to the injection device. Depending on the type of connection to the building component, we distinguish drill-hole packers and surface packers. All packers are standard-equipped with high-pressure fittings. They are also available with low-pressure fittings upon request.

Method of Construction for Injection

 1.Crack and leakage condition inspectionCheck the process procedure after finding the thickness, width and depth of crack and leakage condition of the structure.

 2.Drilling OperationDrill directly into crack section if the thickness of concrete is thinner than 10cm. For the thickness of 10~50cm, drill it with 45 degree angle by keeping a distance of 1/5 of concrete thickness. Make sure it penetrates the crack section. If the thickness is over than 50cm, keep the distance of 20~30cm and drill it with 45 degree angle until it penetrates crack section. And keep drilling by maintaining the fixed interval. (5 holes per 1 meter. Drill it in zigzags)

 3.Packer InstallationClean the inside of drilled holes with compressor. Make sure that rubber sleeve of packer and cutting line of tightening nut should be put into the inside of concrete surface when installing. Tighten the packer completely by using the T-box. (Packer might be damaged if you tighten it too strongly)

4.Injection OperationInject the waterstopping material by using the high pressure device or grease gun.  Maintain the initial injection pressure as around 40kg/cm and increase the pressure by each 10kg/cm gradually until the waterstopping material flows out from crack section. Water will come out from the crack section first and then waterstopping foaming agent and then water stopping liquid at last. If the waterstopping material that is not foamed comes from the crack section, then move to next packer for injection.

 5.Packer Removing OperationRemove and break the packer by using vise pliers or hammer as a tool. If there is still a wet section, then inject the water stopping material again.

 6.Finishing OperationRemove the water stopping material that is remained on the crack section. Spreading with the elastic sealing material.

aluminum injection packer



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.